The mill erased the lot. The stripe plan has to come back.

Stalls, fire lanes, arrows, and accessible markings that still read at night. If paint is an afterthought, turnover is not done — no matter how new the mix looks.

Aerial striped commercial lot, placeholder for striping and marking

Layout, not a machine

Restriping is not the same job as renting a striper.

Most striping vendors sell a machine or a paint crew. A commercial lot is a layout problem. After mill and overlay the old lines are gone. After sealcoat they are buried. A crew that ‘paints what was there’ from memory will miss stall counts, van-accessible spaces, fire-lane widths, and the aisle the fire marshal actually walks. Layout changes — EV, grocery pickup, a new dock — are a civil and striping plan, not a wider brush. Thermoplastic vs paint is a durability and climate choice (salt, UV, turning movements), not a catalog upsell. Night work is normal because the lot still has to sell on Saturday.

NEXTPAVE bids commercial striping from Charlotte with the pavement when they belong together, or as restriping on a sound lot. We do not stripe driveways and we do not sell equipment. ADA symbols are not a stencil extra on a slope that the overlay just broke — stalls and accessible routes belong in the paving number. Attach the striping plan. ‘Match existing’ after a mill is how the lot opens wrong.

Right when

  • Restriping after mill, overlay, or seal — the layout has to return before the lot reopens.
  • A layout change: fire lanes, pickup stalls, truck routing, accessible stalls that were never right.
  • Night work on a live retail or warehouse lot that cannot lose Saturday.

Wrong when

  • Paint on a lot that will mill next quarter. You are paying twice for the same layout.
  • A DIY or rental-machine job on a commercial field. Different liability, different layout.
  • Residential. Out of scope.

What fails

Markings that fail the first weekend.

Facility and risk teams notice these before anyone notices the mix.

Match existing after mill

The old lot is gone. Memory is not a drawing. Stall counts, van spaces, and fire-lane widths come from the plan, not from the last faded line.

ADA as a stencil extra

The symbol is the last inch. Slope, aisle, and van stall are paving and layout. Painting a wheelchair on a steep stall is not compliance work.

Daylight paint on a night lot

If the property makes money after dark, the stripe plan includes a night window and reopen. A weekday-only painter is a different bid.

What’s in the package

A layout that can be audited, not a coat of white.

Scope

  • Stall layout from the drawing — including changes, not only restoration
  • Fire lanes, arrows, hash, and wayfinding called out in the spec
  • Accessible stall markings coordinated with ramps and aisles
  • Night or staged work so the lot stays partly open
  • The same bid as mill, overlay, or seal when those coats erase the lines

After overlay, wait is a spec

Striping too soon on a new lift tracks. Cure and weather windows belong in the turnover plan, not as a punch-list argument.

Salt, UV, and turning aisles

Northern lots chew paint at the drive aisle. Southern UV fades it on the field. Material choice follows climate and traffic, not a single national SKU.

What to send

What to send so striping is not a field invention.

If the mill is in the same package, the stripe plan is not optional. ‘Match existing’ is not a plan.

  • Current striping plan or a marked layout of what must come back
  • Accessible stall count and van stalls as the owner wants them — we implement the drawing; we do not invent legal counts
  • Fire-lane and municipal notes
  • Whether this is restriping only or part of mill / seal
  • Night-work and reopen requirements

Upload bid docs

FAQ

Commercial striping after the pavement moves.

Do you only restripe, or do you lay out a new lot?
Both, when the drawing says so. Restoration after mill is one job. A new stall count, fire-lane change, or pickup layout is another. Attach the plan. We do not invent geometry from a photo.
Should striping be in the mill and overlay bid?
Yes, if the lot has to reopen marked. A paving-only number that leaves striping as an allowance is how fire lanes show up a week late.
Paint or thermoplastic?
It depends on climate, turning movements, and the spec. Salt and heavy aisles chew paint. We bid what the package calls for. We do not publish a national default.
Will you stripe a residential driveway?
No. Commercial and public lots only. The rental-machine market is a different contractor.

Estimating

Attach the stripe plan. Do not write match existing after a mill.